Global Renewables W2R Thornton Cleveleys & Leyland Projects

Laker-Vent provided the following Project Scope:

  • Supply of detail Design, Piping Fabrication, Installation of Pipework, Supports, Testing & Handover for Commissioning of a Facility
  • Pipework meters in total = 28000M with an average nominal bore size 80mm across the two projects, we had an average 50 trades on each project. The projects ran almost consecutively with only a three month delay between the start dates.

“As a PFI project, the time period from initial interest to financial close and on to construction is often 3 years + but Laker-vent stayed with us, secured the work and we are glad that they did. Given the complex and sometimes unique nature of the piping systems on the Lancashire Waste Project, W2R was looking for a contractor that was competent, professional and flexible as well as good value and Laker-vent met those criteria. Laker-vent worked with our teams to help with design detailing and construction methodology and went on to carry out the materials procurement, shop fabrication, erection and testing. Laker-vent did a great job and have been good to work with!”

Bob Johnson, Project Director, Waste 2 Resources LLP