We are proud to have been selected as the M&P contractor on a new Fast Response Power Plants in Saltholme.
Technical information across the two projects Total M installed = 10,212m
Total weld inc = 35,250
Valves procured = 1263
Steelwork manufactured & installed = 187t
All equipment installed by LVE, apart from engines