New Fast Response Power Plants in Saltholme

We are proud to have been selected as the M&P contractor on a new Fast Response Power Plants in Saltholme.

Technical information across the two projects Total M installed = 10,212m

Total weld inc = 35,250

Valves procured = 1263

Steelwork manufactured & installed = 187t

All equipment installed by LVE, apart from engines